[parental control] temporary extension of timelimit

Hi,

a option to temporary extend the timelimit would help.

  • globally for all apps in the parental control menu
  • per app while opening a timelimited app

In general the user should be able to select certain time frames (1h, 1 day etc.) and after the extended time frame has been used it should automatically fall back to the initially defined time limit.

Thanks!

Regain your privacy! Adopt /e/OS the deGoogled mobile OS and online services

1 Like

This topic was automatically closed after 180 days. New replies are no longer allowed.